Report

Productivity Benchmark Report for Manufacturers

What happens to productivity in the 90 days after a plant connects its frontline? We measured 1,500 of them.

We analyzed 1,500 plants that ran Redzone’s standardized 90-day deployment between 2013 and 2024 — 491,000 frontline workers and more than 50 million production runs, captured automatically from the lines. On average, OEE rose 12.5 points in those 90 days, a 26% productivity gain. That’s five days of output in four.

In summary

  • 12.5-point OEE gain in 90 days

  • 26% productivity increase

  • 1,500 factories, 50 million production runs

  • Download your free report.

    Three Winter 2026 enterprise badges highlighting Best Results, Easiest To Use, and Highest User Adoption.

    What You'll Learn

    Trusted by 2,000+ factories worldwide

    to drive productivity and connect frontline teams with AI where the work happens.

    8th Avenue Food & Provisions logo with white skyline on blue background.
    ACH Food Companies, Inc. logo with green italicized letters and stylized swoosh
    Orange and black striped cat curled above Alvarado St. Bakery text logo.
    Arizona Natural Resources Inc. logo with stylized ANR letters and orange and blue swooshes.
    AWC logo featuring text and a circular design element.
    Bell & Evans logo with a chicken farm scene and the words Air Chilled.
    Blommer Chocolate Company logo in red and black text.
    Café Valley Bakery logo with a red and beige striped umbrella above the name in blue text.